Thursday 21 January 2010

Peizoelectricity

Putting peizoelectricy generating floor systems in bottle neck zones will produce enough electricity to supply the Wastefield Centre. Areas such as entrances to all shops. The entrances of the Westfield Centre. Ticket gates at the tube station. Bus stops. These collection areas will transfer the electricity to a central substation situated on the top of the Westfield Centre and from there will connect to the Wastefield Centre.
All these areas hold significance as they reflect the urban semiotics of the surrounding area of the Westfield Centre. Due to movements of people and there everyday journeys, there is a relationship between pedestrians, their attention, and how they can be turned into useful resources to improve the viability of the Wastefield Centre.

No comments:

Post a Comment